Minworth is Severn Trent Water’s largest wastewater treatment facility. The existing facility treats sludge arising from a population equivalent of 2.3 million. This project contributes to Severn Trent’s drive to reduce their Carbon Footprint in AMP6 by 10% and to have 25% of their biosolids produced at an enhanced sludge status. BIM is a part of a new delivery model which sets new behaviours and collaboration practices. The total savings estimated through this digital delivery approach are £5m or approximately 13.5% of the cost.